Offshore Wind 4 Kids, Wexford

Would your family like to build your own wind turbine?
Join us for a fun-filled event where you will learn more about engineering, technology and renewable energy.

At GDG, we’re delighted to partner with OffshoreWind4Kids to bring their international Demo Days to Ireland.

Our next event will take place on Sunday, 28 August 2022, on Curracloe Beach, Wexford.

Join us for the opportunity to build your own wind turbine, learn more about engineering, technology and renewable energy, and have lots of fun too!

In this hands-on 45 min session, your group of up to five people will enjoy:

  • A short introduction to offshore wind
  • Building a wind turbine
  • Building one fixed and one floating structure
  • Decommissioning the wind turbine

You can get hands-on by joining as a participant, or if you’d prefer just to watch, you can also join as a passer-by.

Register here

Children aged 3 and up are welcome, but we’ve found that kids from 8 to 12 find the activity most engaging. Each group must include at least one adult.

The event is kindly sponsored by Venterra Group.

Latest

Here's some of the great things we're getting up to

All articles
News

10th April 2024

GDG Wins Key Contract for Baltica 1 Offshore Wind Farm

Find out more
News

12th March 2024

ShipFuel to Steer Irish Maritime Sector to a Low-Carbon Future

Find out more
News

12th March 2024

Venterra Geoscience Supporting Offshore Wind Energy in Atlantic Canada

Find out more
News

8th March 2024

GDG Welcomes Offshore Wind Industrial Strategy

Find out more

Get in touch.

Do you have a project to discuss? Get in touch with us today.